Vote NO on Kitsap PUD Prop 1
Too costly. Too Risky. No Plan.

PUD Proposition 1 will give the Kitsap PUD — a small government agency — authority to condemn and purchase private utility property, acquire more public debt, set electricity rates and take over all electrical facilities in Kitsap County — no matter the cost and despite the fact that it has no expertise or experience maintaining an increasingly complex grid and responding to storms, wildfires and electric emergencies.
That’s too risky.
Kitsap PUD Proposition 1 will force Kitsap taxpayers to take on more than $1 billion in new taxpayer debt
Preliminary estimates show that taking over Kitsap’s electrical infrastructure will cost more than $1 billion — more than $7500 per customer. To pay for it, the Kitsap PUD would need to raise property taxes 20 times what they are today.*
And an independent analysis reveals purchasing the system’s assets alone could cost up to $1.5 billion!**
In 2008, public power proponents told voters that the Jefferson County PUD could take over Puget Sound Energy (PSE) and start an electric utility for $47 million. The final cost was $109 million. Kitsap County has over 130,000 customers compared to 18,000 customers in Jefferson County — making this an even riskier gamble.
It makes no sense to take on so much taxpayer debt for something that already exists and is reliable when we have so many other critical priorities.
That’s too costly.
*SOURCE: July 2026 email exchange between Angela Bennink, General Manager, Kitsap Public Utility District, and Stacie Amasaki, Attorney, Foster Garvey. Bennink: “We believe that purchasing the PSE asset will be between $800 million and $1.2 billion. This would require a levy of about $.92 on the thousand.” The current property tax rate for the KPUD is $0.04444 per $1,000 assessed value. Read the exchange
**SOURCES: Concentric Energy Advisors independent analysis of the financial value of PSE’s electric transmission and distribution assets in Kitsap County, September 22, 2026. “The starting price is $1.2 billion to $1.5 billion for poles and wires alone. It doesn’t include the substantial costs of creating, financing or operating a new facility.” — Josh Nowak, Vice President at Concentric Energy Advisors. Download the analysis fact sheet. Kitsap Sun, 9/23/26: “PSE study says takeover of Kitsap assets could cost KPUD $1.5 billiont.”
PUD Prop 1 gives the Kitsap PUD a blank check
Kitsap PUD Prop 1 gives three part-time Commissioners the authority to takeover PSE’s local electric system before knowing the total cost, where the power will come from, future electric rates, or tax impacts. If passed, Kitsap residents will have no choice but to get their power from Kitsap PUD, regardless of the cost.
At a time of growing power demand, we shouldn’t jeopardize electric service for more than 280,000 Kitsap residents with an inexperienced PUD with 16,000 current customers.
That’s reckless.
PUD Prop 1 was rushed onto the ballot without considering the consequences
Rather than conduct a study ahead of the vote and provide voters with answers to critical questions, the Kitsap PUD rushed PUD Prop 1 to the ballot and now claims they will study the issue after the vote.
But voters will have no ability to say “stop” because the PUD Commissioners don’t need a second vote to proceed with a takeover.
That’s wrong.